cert-iso9001 cert-iso14001 cert-45001 Created with Sketch. I
08 9311 5311 Email
LinkedIn YouTube

Projects

We can design, manage, install, commission and maintain a complete solution.

APA

Upgrade connections to Vent Recovery systems at CNS Bus Depots
Located All CNG Bus Depots Perth, Metro Area
Replacement of CNG Dispensers
Located all CNG Bus Depots Perth, Metro Area

BHP Billiton

Fleet Management System – Installed New Digital Radio, Modular Mining System and Hornets
Located Mt Whaleback, Newman, Pilbara, Western Australia
Installation of a remote isolation system for conveyors (REMSAFE) on P702 Nelson Point
Located Nelson Point, Pilbara, Western Australia
Waste Water Treatment Plant – Installation of Biomax WWTP
Located Whaleback, Pilbara, Western Australia
HV Cable Jointing – Repairs and In line joints to HV Stacker Trailing Cable
Located Mt Whaleback, Pilbara, Western Australia
BMS – Installation of Belt Management System
Located Nelson Point, Pilbara, Western Australia
Risk Mitigation – Supply and install Automated Switching to ABB NAL Switchgear
Located Nelson Point, Western Australia

FMG

Installation of a remote isolation system for conveyors (REMSAFE) at Anderson Point
Located Anderson Point, Pilbara, Western Australia
Trailing Cable Replacement – Replacement of Trailing Cables inc. all terminations
Located Anderson Point, Pilbara, Western Australia
Shut Down Support – Supply parts and labour for ongoing maintenance shut downs
Located Anderson Point, Pilbara, Western Australia

Golder and Associates (For Chevron)

Design/Supply and Commission MCC VSD’s and Controls for Compressors
Located Barrow Island, Western Australia

Rio Tinto Iron Ore

Installation of Online Condition Monitoring Infrastructure
Mesa A Fixed Plant, Paraburdoo Stackers, Cape Lambert Fixed Plant
Located Pilbara, Western Australia
Installation of ICM Proprietary REMSAFE (Remote Isolation) System on CV08 Paraburdoo
Located Paraburdoo, Pilbara, Western Australia
Design, Supply and Install Slew Chamber Junction Boxes
Located Cape Lambert, Pilbara, Western Australia
Upgrade Fuel Farm
Located Channar, Pilbara, Western Australia

Water Corporation

Installation of Cabling for Sewerage Overflow Alarms in excess of 150 locations
Located Perth Metropolitan Area, Western Australia
Pump Station Switchboard Upgrade
Located Midland, Perth
Earthing – HV Step and Touch potential earthing mitigation
Located Lexia, Perth