cert-iso9001 cert-iso14001 cert-45001 Created with Sketch. I
08 9311 5311 Email
LinkedIn YouTube

Latest News

05 Nov Munster 3SPS Project

Munster 3SPS Project

ICM Group has been selected to undertake an electrical upgrade of the Munster 3 SPS one of our major clients largest and most critical wastewater pumping station with a catchment area consisting of most of the southern suburbs of Perth, with works occurring over a period of 18 months. The works being undertaken by ICM Group include:  Installation of 6 new ABB ACS880-37 VSD’s, ...

Read More
14 Jul Precision Laser Engraving Solutions

Precision Laser Engraving Solutions

At ICM Group, we deliver high-performance engraving services using the Epilog Fusion Pro laser engraver, offering a generous maximum print size of 800mm x 500mm. Whether you’re looking for durability, clarity, or precision, we provide tailored solutions for industrial and commercial applications. We design and produce a variety of high-quality labels and tags, including: Traffolyte Sw...

Read More
22 Jul Main Switchboard Replacement Project

Main Switchboard Replacement Project

We recently executed a Main Switchboard replacement project for a large utilities supplier in the Perth Metro region. The project involved the manufacture of a temporary switchboard, landing and connecting a temporary 200kVA Genset and executing a changeover from mains electricity to temporary electricity so the tenant could continue to operate during the replacement works. The main works involved...

Read More
11 Apr Murchison Project Works

Murchison Project Works

Our projects division has been engaged by a mining equipment OEM to install the electrical system associated with the installation of a new section of the tailings conveyor, as well as modifications to the existing conveyer structure, for an Iron Ore mine in the Murchison region of WA. The preparatory works will require 7 technicians for 10 days followed by a 22 person team consisting of 2 supervi...

Read More